WE Credit 1.2: Water Efficient Landscaping: No Potable Water Use
or No Irrigation
1 Point in addition to WE Credit 1.1
Use Permeable Asphalt on the middle of the parking areas in conjunction with other water collection methods. Pipe the water to a holding tank under the ramp to Irrigate greenery during droughts.
SS Credit 6.1: Storm water Design: Quantity Control
1 Point
Use valves in the piping that leads to the storage tank. Will have a diversion pipe that goes to an external source if there is too much water or it is not needed.
EA Credit 2: On-Site Renewable Energy
1–3 Points
Use solar panels to power everything that is involved with the parking lot. Batteries store the power for night and clouded days. An inverter changes the power so it can be used. The batteries are the biggest problem with this system. First they are expensive. Second they can get a “memory” if the battery is not fully discharged before charging. This takes many cycles. The Batteries that were chose are Deep Cycle Lead-Acid. There were chosen because of their ability to with stand frequent discharges.
Wednesday, June 11, 2008
Tuesday, June 10, 2008
Monday, June 9, 2008
Friday, June 6, 2008
Friday, May 30, 2008
Wednesday, May 28, 2008
Tuesday, May 27, 2008
Monday, May 26, 2008
day 2
Today i can up with solutions for enviromental problems with parking lots.
Renewable energy source:
-Solar panels to power lights,
Water efficient landscape
-use plants that use little water,
-leave grass longer, helps reduce weeds and less water
Rapidly renewable materials
-plant bamboo and other usable and renewable plants
Parking capacity
-Smaller parking lots so that there are less cars in one area.
Renewable energy source:
-Solar panels to power lights,
Water efficient landscape
-use plants that use little water,
-leave grass longer, helps reduce weeds and less water
Rapidly renewable materials
-plant bamboo and other usable and renewable plants
Parking capacity
-Smaller parking lots so that there are less cars in one area.
Friday, May 23, 2008
Day 1
First stage: Brainstorming
I started brainstorming ideas for a parkinglot for our summative. I started thinking that I diddn't want to use traditional parkinglot styles. They are boring and dull looking with no appeal. My idea is to add greenery and appeal to the parkinglot. This will include sections for bikes and pedestrian traffic. There will be spots designated for specialtiy vehicles near the closest entrance. This is all I have now.
I started brainstorming ideas for a parkinglot for our summative. I started thinking that I diddn't want to use traditional parkinglot styles. They are boring and dull looking with no appeal. My idea is to add greenery and appeal to the parkinglot. This will include sections for bikes and pedestrian traffic. There will be spots designated for specialtiy vehicles near the closest entrance. This is all I have now.
Subscribe to:
Posts (Atom)

